1. general
1.1 B coating. J. Acutate for concrete surfaces is an abrasion-resistant coating with very good exterior resistance, as well as environmentally friendly materials (water-based) and for the user (lead free and chromates).
1.2 B coating. J. An acrylic cavity suitable for the upper lining of bicycle paths, sports fields, and traffic islands made of asphalt and concrete.
1.3 UV resistant, durable in all weather conditions, with excellent coverage, easy to apply.
1.4 Available in red (terracotta), green (bottle) or on demand.
1.5 Sold in packs of 25 kg.
1.6 Application on new asphalt will be carried out at least one month from the end of paving.
1.7 Do not carry the coating if it is expected to rain to 48 hours before application.
1.8 Do not apply the coating during hot hours above 30 ° C or on cold days below 10 ° C and at temperatures above 85%.
2. Preparation of the surface before painting:
2.1 The asphalt must be cleaned with dust, grease, or any other dirt.
2.2 Rinse with water under pressure until all loose particles are removed.
2.3 Before applying the primer, make sure that the substrate is built with slopes that adjust to drain water and feed cracks.
2.4 If there are holes, holes or cracks, seal with suitable sealing material for the type of surface. J. Technologies.
2.5 Apply the paint only after drying.
2.6 In cases of sunsets / holes / cracks repair, applying the dye after 48 hours at least.
3. יApplication Primer:
3.1 By painting on a concrete surface, it should be applied. J. Flexil 162 as a connecting material between the infrastructures.
3.2 Do not mix the Me. J. Flexil 162 With other materials.
3.3 Me. J. Flexil 162 is a primer for the preparation of a concrete surface for application. And does not serve as a filler or repair of the substrate.
3.4 The number of primer layers depends on the condition of the substrate surface.
3.5 Me. J. Flexil 162 is not suitable for application on asphalt surfaces.
3.6 It is recommended to apply in me. J. Flexil 162 in the morning before warming the substrate, to prevent the formation of membranes and lumps on the surface of the primer.
3.7 Mix well the two parts of me. third'. Flexus 162 with a mechanical mixer, according to the instructions on the packaging, until the mixture is uniformly mixed.
3.8 Apply a primer layer of primer on top of the substrate. J. 162 with a professional silicone wiper, 1-0.7 (1.0-1.5 / kg per square meter, depending on the roughness of the concrete) The application will be carried out continuously and without breaks.
4. Surface painting:
4.1 Do not mix the coating material with other materials.
4.2 You shed me. J. KWT on the surface, will be in the amount of 1.5-1.0 kg per square meter to the first layer.
4.3 You have to pour me. J. Quot at the edge of the surface and apply a professional rubber wiper to the width of the surface and add to it. J. Quot according to the progress applied throughout the surface, thickness of the coating on the first application
Will be 1 mm.
4.4 The waiting time between the first and second layers will be 4-8 hours (depending on the temperature).
4.5 The application of the second layer will be executed in the same way as the first layer, but this time the application will begin from the place where the first layer ended. The material shedding in the second layer is in the amount of 0.8 kg per square meter.
4.6 The thickness of the coating after the two layers is approximately 1.5 mm.
5. Marking the pitch
5.1 The plots will be marked with white stripes, depending on the type of the plot, and will be carried out in BBI. J. Krill 2000 in the amount of 0.2 per square meter.
6. Drying time:
6.1 The waiting time between performing the primer and the first layer is approximately 2 to 24 (depending on the weather conditions).
6.2 Standby time between the two layers: 4-10 hours (depending on the temperature).
6.3 Manual touch standby time: 2 hours.
6.4 Dry hard to rise on surface: 3-7 days (depending on temperature).
6.5 Full drying for washing and cleaning: 7 days from the date of painting.
6.6 It is the responsibility of the Contractor and at his expense to hedge the paint area until the color is dried.
All of the above is only a recommendation, given according to the best knowledge we possess and our extensive experience.
However, because the work is not under our control, the factory's warranty is limited to the quality and quality of the product only.
The operation must check compliance with its needs and proper performance of the work.

Contact Us

logo bg bond
BJ (Israel) Technologies Ltd., Kibbutz Beit Guvrin, moving post to Lachish South, 79370 //
Phone: 08-6874236 Email: info@b-gtech.com

Copyright © BG Bond. All rights reserved
logo ashtrum2